Data Center - Coming Soon
"We had budgeted 1 week of erection and it went up in 2 days. This was in addition to being an already significantly lower cost solution." - Owner
| Description 165,000 sf - 7 levels - rooftop pool - 75 residences - Ted's Monana Grille and parking downstairs - Commerce & Decatur St. Solution: Kore-Flex Columns, VERSA:T: Beams, Steel Bracing, and Composite floor system Overview: Addition of a large mechanical pad on top of a 6 story building in Downtwon Atlanta. Long spans and light nature of VT beams with metal deck allowed for fast installation on an existing structure. |
Owner Bank General Contractor Humphrey's Structural Engineer Housh Rahimzadeh, PE |